Project Overview
The following improvements are proposed:
- Replacement of sidepath / sidewalk with 10’ wide shared use pathway
- Storm drainage improvements (roadside ditches may remain)
- Belgian block curb installation, where warranted
- Roadway resurfacing
- Other associated work including roadway signage, street tree removals / replacements, and pavement striping
Construction of the improvements is anticipated to occur in 2022.